Swingaway SWGSB100 User Manual

Browse online or download User Manual for Sports and recreation Swingaway SWGSB100. SwingAway SWGSB100 User Manual [en] [de]

  • Download
  • Add to my manuals
  • Print
  • Page
    / 24
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
L
S
HITTING
MAT
CORD
CONNECTOR
R
JK
B
V
U
W
W
X
Q
N
M
O
I
H
A
F
C
T
P
G
E
D
G
"GET READY TO GET GOOD""GET READY TO GET GOOD"
A TOP FRAME HOOP O TELESCOPE FITTING
B FRAME UPRIGHTS (2) P HEIGHT ADJUST ROPE
C BOTTOM FRAME HOOP Q BOOM SUPPORT FITTING
D EYE BOLTS R TOP BOOM PULLEY
E FOOT SPLIT FITTING S BOTTOM BOOM PULLEY
F LEG EXTENSIONS (2) T KNOB (4)
G COUPLER FITTINGS (6) U NET AND RED ROPE
H BASE HOOP FITTING V NET CLIPS (56)
I BASE HOOP W BUNGEES (3)
JK TOP BOOM (53”) X BALL WITH TETHERS
L BOTTOM BOOM (53”)
Not shown:
M INNER TELESCOPE
Allen wrench, manual
N OUTER TELESCOPE
MVP/XXL
ASSEMBLY MANUAL
SWINGAWAY
SWINGAWAY
SPORTS PRODUCTSSPORTS PRODUCTS
SPORTS PRODUCTS
THE "SwingAway®" PRODUCT IS PROTECTED UNDER US PATENTS 5,795,250 AND 7,914,400.
Copyright © SwingAway Sports, LLC 2013 | All Rights Reserved
Page view 0
1 2 3 4 5 6 ... 23 24

Summary of Contents

Page 1 - SWINGAWAY

LSHITTINGMATCORDCONNECTORRJKBVUWWXQNMOIHAFCTPGEDG"GET READY TO GET GOOD""GET READY TO GET GOOD"A TOP FRAME HOOP O TELESCOPE FITTIN

Page 2 - John J.Flading

MNTIGHTENKNOBINSERT ALLTHE WAY INSLIDE THIS PIECEALL THE WAY DOWNBASE ASSEMBLYOPART O IS ATTACHEDTO N WITH CORDSSTEP 5STEP 5REAR TELESCOPEFITTING ISAC

Page 3 - IN THE BOXIN THE BOX

NSTEP 6STEP 6PUT THE NET FRAME ON THE OPENPART OF THE FOOT SPLIT FITTINGSAND RAISE THE TELESCOPES!BOOM SUPPORTFITTINGINSERT (N) POLEINTO BOOM SUPPORTF

Page 4

ROTATE UPTO CLOSEAND TIGHTENFINGER TIGHTFOOT SPLIT FITTINGSRE-ASSEMBLE THEFOOT SPLIT FITTINGSSTEP 7STEP 71010MVP/XXLASSEMBLY MANUALSWINGAWAYSWINGAWAYS

Page 5

STEP 8STEP 8ATTACH BOTTOM BOOM - PART LPART L HAS PART S ATTACHEDPUT THE BOTTOM BOOM INTO THE STUB ON THE FRONT NET FRAME - ALL THE WAY INTIGHTEN THE

Page 6 - STEP 1STEP 1

STEP 9STEP 9VERY IMPORTANT!LEVEL YOUR MACHINE OUTTOUCHFLOORTOUCHFLOORTOUCHFLOORKNOB TIGHTKNOB TIGHTWHILE ON A FLAT SURFACE, ADJUST THE FRAME BY PULLIN

Page 7 - STEP 2STEP 2

5 INCHES INJKRSTEP 10STEP 10PUT THE TOP BOOM INGET PART JK AND THE TOP BOOM END PULLEY - PART R (WITH THE RED PULLEY)INSERT THE TUBING AS FAR AS IT WI

Page 8 - STEP 3STEP 3

STEP 11STEP 11ATTACH THE NET WITH NET CLIPSVNETCLIPDEPENDING ON THE HEIGHTOF THE HITTER WEAVE THETARGET ROPE BETWEEN WEBS OF THE NETAPPROXIMATELY 10 W

Page 9 - STEP 4STEP 4

STEP 12STEP 12THREAD THE BUNGEESCOME THRU PULLEY ON TOP BOOMGO THRUTHIS PULLEYTHREAD THISTHRU THE CORDCONNECTORAND TIE A KNOT123465THREAD BOTTOM BUNGE

Page 10 - STEP 5STEP 5

STEP 13STEP 13INSTALL THE ROPES21THREAD YOUR CORDSTHRU THE EYEBOLTS ON EACH SIDETHREAD THISTHRU THE CORDCONNECTORAND TIE A KNOTFOR HELP WITH THIS PROC

Page 11 - STEP 6STEP 6

ADJUST THE BALL HEIGHTADJUST THE CORD IN THIS FITTINGTO CONTROL THE BALL HEIGHTSTEP 14STEP 141717MVP/XXLASSEMBLY MANUALSWINGAWAYSWINGAWAYSPORTS PRODUC

Page 12 - FOOT SPLIT FITTINGS

Dear SwingAway Customer, Thank you for your new purchase of a SwingAway Batting System. Today will launch a New Chapter in your baseball or softball c

Page 13 - STEP 8STEP 8

STEP 15STEP 15GET YOUR HITTING MAT OUT1818MVP/XXLASSEMBLY MANUALSWINGAWAYSWINGAWAYSPORTS PRODUCTSSPORTS PRODUCTSSPORTS PRODUCTSTHE "SwingAway®&qu

Page 14 - STEP 9STEP 9

FOLDING INSTRUCTIONSFOLDING INSTRUCTIONSTAKE OFF THE TOP BOOM FITTINGAND THREAD IT INTO THE NETLOOSEN THE T-NUT ANDTAKE OFF THE BOTTOM BOOMTHREAD IT I

Page 15 - STEP 10STEP 10

FOLD UP THE REAR SUPPORTFOLLOW WITH THE BACK FRAMEYOUR SWINGAWAY IS READY TO STORE.67FOR HELP WITH THIS PROCESSPLEASE REFERENCE OUR YOUTUBE VIDEO LINK

Page 16 - STEP 11STEP 11

HITTING MATHITTING MATOUTSIDE PITCH MIDDLE PITCH INSIDE PITCHOUTSIDE PITCH MIDDLE PITCH INSIDE PITCHFOR LEFT HANDED HITTERSALIGN THE MACHINE TO SIMU

Page 17 - STEP 12STEP 12

Safety Pre-CautionsThe SwingAway® has been designed to be safe when used as intended; the swinging bat is the most dangerous aspect of using the Swing

Page 18 - STEP 13STEP 13

IN THE BOXIN THE BOX11PARTS LISTA TOP FRAME HOOPB FRAME UPRIGHTS (2)C BOTTOM FRAME HOOPD EYE BOLTSE SPLIT FOOT FITTINGF LEG EXTENSIONS (2)G COUPLER FI

Page 19 - STEP 14STEP 14

ALTERNATIVE PARTSALTERNATIVE PARTSSOME BOXES MAY HAVE ALTERNATIVE PARTS,DO NOT WORRY - ALL PARTS ARE TESTED ANDWILL WORK ON YOUR SWINGAWAY.NOTE:THIS P

Page 20 - STEP 15STEP 15

CORDCONNECTORLOCATIONSCORD CONNECTORSCORD CONNECTORSSOME PARTS MAY REQUIRE ATTACHING CORD CONNECTORSDON'T WORRY - IT'S EASYNOTE:KNOT THE END

Page 21

NET FRAMEASSEMBLE THE NET FRAMESTEP 1STEP 1COUPLERFITTINGGGET PARTS “A”, “B”, AND “C”. THERE ARE TWO PART “B”’s, FOUR PARTS TOTAL.GET THREE EYEBOLTS

Page 22

STEP 2STEP 2ATTACH THE COUPLERS MAKE SURE THE PIPES ARE INSERTED HALFWAY IN THE COUPLER..IMPORTANT:ALLEN WRENCHSET SCREWSMAKE SURE THEFRAME IS FLATAND

Page 23 - FOR RIGHT HANDED HITTERS

EYEBOLTSUPFEET DOWNIFFGEESTEP 3STEP 3BASE ASSEMBLYCOUPLERTUBINGTUBINGHALFWAY INREMEMBER - HALFWAY INGET PARTS “I”, AND “F”. THERE ARE TWO PART “F”’s,

Page 24

STEP 4STEP 4OPEN UP THE FOOT SPLIT FITTINGSTAKE THE SCREWS OUT OF THE FRONT OF THE FOOT SPLIT FITTINGSAND OPEN THE FITTINGS UP.PIVOTS OPEN LIKE A CLAM

Related models: SWG100 | SA100BBR |

Comments to this Manuals

No comments